News

Latest News

View the latest Tristar Port of Guyana operational updates, cargo handling activity, and port logistics images.

Featured story

Simultaneous 169 Metre Handysize Vessel And 119 Metre Cargo Vessel

By Tristar Port of Guyana

Tristar successfully completed coordinated discharge operations for two commercial vessels through integrated marine and cargo-handling activity, with work continuing across both day and night shifts.

A handysize vessel and a cargo vessel berthed simultaneously at Tristar Port of Guyana.

169-Metre Handysize Vessel

Assisted by tugboats, the 169-metre handysize vessel was safely manoeuvred into position before cargo discharge commenced. The vessel carried a diverse range of cargo weighing approximately 2,300 freight tonnes.

A 169-metre handysize vessel assisted by tugboats during daytime berthing operations at Tristar Port of Guyana.

Day Operations

Cargo handling progressed throughout the day through coordinated marine, equipment, and ground operations. Teams worked across the vessel and berth to maintain safe and efficient cargo movement.

119-Metre Cargo Vessel

While discharge of the handysize vessel was underway, a 119-metre cargo vessel arrived carrying 54 forty-foot containers. Both vessels were handled simultaneously through coordinated operations.

A handysize vessel alongside the illuminated Tristar quay during night-time cargo operations.

Night Operations

Operations continued through the night, allowing both vessels to be discharged efficiently, safely, and without interruption.

Operations Completed in Record Time

Through coordinated planning and active communication, both vessels were successfully discharged in record time, highlighting Tristar Port of Guyana's ability to efficiently manage multiple vessels and diverse cargoes.

More from the port

Latest operational updates

Open any image to view it at full size and read the complete activity caption.

Night Operations

Operations continue after dark at Tristar Port of Guyana, with vessel activity and cargo handling carried out along the quayside through coordinated night-time operations.

Operational Readiness

Ground Bearing Pressure (GBP) testing underway at Tristar Port of Guyana, helping verify equipment stability, ground support, and operational readiness ahead of heavy-lift activities.

Heavy Lift

Our team successfully supported the offloading of a 36.2m bullet tank weighing approximately 75 tons, demonstrating the coordination, planning, and heavy-lift capability required for safe and efficient project cargo operations.

Project Cargo

Project cargo discharge operations at Tristar. Safe, efficient and precision driven cargo handling.

Project Cargo

Specialized handling and coordinated lifting ensure safe and efficient movement of equipment.

Container Handling

Efficient container handling and seamless port operations supporting trade, logistics and offshore development.

Heavy Lift

When offloading heavy machinery from a cargo ship, precise coordination, specialized equipment and strict safety procedures are implemented to ensure efficient transport and timely delivery.

Cargo Operations

Large-scale discharge of pipe bundles underway at Tristar Port of Guyana, highlighting our continued role in supporting efficient cargo handling, port operations and logistics activity.

Container Operations

A 119-metre cargo vessel carrying 54 forty-foot containers was safely berthed and discharged through coordinated cargo-handling operations.

Breakbulk & Project Cargo

A 169-metre handysize vessel carrying approximately 2,300 freight tonnes of diverse cargo was safely berthed and efficiently discharged through coordinated operations.

Get in Touch

For general enquiries or additional information, please contact us.

Contact us

* Required fields